{"id":1437,"date":"2024-12-30T10:29:54","date_gmt":"2024-12-30T02:29:54","guid":{"rendered":"http:\/\/www.gowe-group.com\/2024\/12\/30\/hello-world-6\/"},"modified":"2025-04-27T09:53:05","modified_gmt":"2025-04-27T01:53:05","slug":"hangzhou-flughafen-rail-express-wuchang-ausbildungsstatte","status":"publish","type":"post","link":"https:\/\/www.gowe-group.com\/de\/hangzhou-airport-rail-express-wuchang-training-base\/","title":{"rendered":"Hangzhou Airport Rail Express Wuchang Trainingsbasis"},"content":{"rendered":"<p><\/p>\r\n<p><\/p>\r\n<p><\/p>\r\n<p>Die Wuchang -Trainingsbasis (Abschnitt I) des Hangzhou Airport Rail Express im Distrikt Yuhang, Hangzhou City, Provinz Zhejiang, ist ein wichtiges Infrastrukturprojekt, das gemeinsam von der China Railway First Group Construction and Installation Engineering Co., Ltd. und Gowe Group gebaut wurde.<\/p>\r\n<p>Das Projekt befindet sich im Subdistrikt Wuchang, westlich der Hangzhou Ring Expressway und n\u00f6rdlich der Yuhangtang Road, und erstreckt sich \u00fcber eine Gesamtfl\u00e4che von 49.633,07 Quadratmetern.<\/p>\r\n<p>Als kritisches unterst\u00fctzendes Projekt f\u00fcr den Hangzhou Airport Rail Express, das f\u00fcr die Asian Games Infrastructure integriert ist, befindet sich die Wuchang-Trainingsbasis strategisch in der zuk\u00fcnftigen Stadt Sci-Tech City des Distrikts Yuhang.<\/p>\r\n<p>Die China Railway First Group und die Gowe Group waren entscheidend in der Bereitstellung dieser hochmodernen Einrichtung und nutzten ihr Fachwissen bei der Entwicklung gro\u00dfer Bau- und Bahninfrastruktur.<\/p>\r\n<p><\/p>\r\n<p><\/p>\r\n<p><\/p>","protected":false},"excerpt":{"rendered":"","protected":false},"author":1,"featured_media":3694,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[24,29,28,30,35],"tags":[],"class_list":["post-1437","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-project","category-product","category-area","category-aluminium-formwork-system","category-single-sided-support-formwork"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.gowe-group.com\/de\/wp-json\/wp\/v2\/posts\/1437","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.gowe-group.com\/de\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.gowe-group.com\/de\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.gowe-group.com\/de\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.gowe-group.com\/de\/wp-json\/wp\/v2\/comments?post=1437"}],"version-history":[{"count":0,"href":"https:\/\/www.gowe-group.com\/de\/wp-json\/wp\/v2\/posts\/1437\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.gowe-group.com\/de\/wp-json\/wp\/v2\/media\/3694"}],"wp:attachment":[{"href":"https:\/\/www.gowe-group.com\/de\/wp-json\/wp\/v2\/media?parent=1437"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.gowe-group.com\/de\/wp-json\/wp\/v2\/categories?post=1437"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.gowe-group.com\/de\/wp-json\/wp\/v2\/tags?post=1437"}],"curies":[{"name":"WP","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}