puntal de acero gowe
Tubo de acero para andamios-1
Vigas de aluminio Grupo GOWE
Acoplador de retención de tablero forjado británico-1
Marco Andamio-1
andamio plank-gowe
Sistema de encofrado a una cara GOWE
Sistema de encofrado de acero inoxidable de alta resistencia GOWE (2)
Mesa de encofrado de aluminio GOWE
Vigas de madera GOWE H20 (7)
Venta y alquiler de encofrados de aluminio-GOWE
Encofrado eólico e hidroeléctrico
Encofrados prefabricados GOWE
Carro de instalación de membranas impermeables GOWE
Encofrado de montaje segmentado
Encofrado de cestas colgantes GOWE
ENCOFRADO DE MUELLE GOWE
Rejilla espacial monocapa de pared delgada
Carro impermeable
Pedestal de rodamiento de segmento -2 (2)
Estructura de armazón de gran altura
Taller con estructura de acero tipo pórtico
Puente de vigas de acero
Plataforma de trabajo de escalada de mástil eléctrico GOWE
plataforma de protección-gowe
Encofrado en voladizo GOWE
Gowe project-Pier formwork- C1906

LTA C1906, Singapore

Located at 2A Tuas West Dr, Singapore, Contract 1906 (C1906) is a strategic infrastructure project commissioned by the Land Transport Authority (LTA). This project involves the design and construction of a critical railway viaduct that connects the Tuas West Extension (Tuas Link Station) to the Singapore Rail Test Centre (SRTC).

Proyecto Detalles

Descripción

Located at 2A Tuas West Dr, Singapore, Contract 1906 (C1906) is a strategic infrastructure project commissioned by the Land Transport Authority (LTA). This project involves the design and construction of a critical railway viaduct that connects the Tuas West Extension (Tuas Link Station) to the Singapore Rail Test Centre (SRTC). As a dedicated link supporting 24/7 all-weather train testing services, the structural integrity of the viaduct is non-negotiable. Acumularse is proud to have played a central role in this project by providing the specialized construction solutions for the Bridge Piers (Columns)—the fundamental pillars that support the weight and dynamic load of Singapore’s future rail testing network.

 

GOWE Project-C1906

 

GOWE Solution

For the C1906 viaduct, the construction of the bridge piers required a perfect balance of structural strength and architectural precision. GOWE provided a comprehensive Steel Formwork solution specifically engineered for the heavy-duty requirements of railway pier casting.

By utilizing GOWE’s high-performance Steel Pier Formwork systems, the project team achieved the rigorous vertical alignment and tight dimensional tolerances mandated by LTA standards. Our solution was designed to withstand the immense lateral pressure of large-volume concrete pours, ensuring that each bridge pier achieved a superior, smooth finish with maximum durability. To meet the project’s demanding schedule, our modular steel forms allowed for rapid assembly and efficient cycling between pier locations. Through our technical partnership on-site, we ensured that the backbone of the C1906 viaduct was built to last—reinforcing GOWE’s commitment to delivering world-class infrastructure solutions, anytime and anywhere.

Facebook
Twitter
LinkedIn

Relacionado Soluciones

Relacionado Productos

Relacionado artículos
Understanding the Cost Implications of Different Formwork Materials
What Factors Drive the Cost of Different Formwork Materials? Key...
Movable Scaffolding Systems: 2026 Bridge Project Guide
What Are Movable Scaffolding Systems and Why Are They...
How GOWE Aluminium Beams Optimize Shoring Systems
In modern civil engineering, aluminium beams have redefined...
How to Choose the Right Pipe Diameter for Stage Scaffolding Applications?
Why is Pipe Diameter Crucial for Stage Scaffolding? The...
How to Choose the Best Scaffolding Supplier in 2026
What Factors Should You Consider When Selecting a Scaffolding...
¿Cómo se pueden prevenir las fallas del encofrado de hormigón de manera efectiva?
Causas comunes de fallas de encofrado de hormigón Diseño. ..