{"id":1562,"date":"2024-12-30T10:29:54","date_gmt":"2024-12-30T02:29:54","guid":{"rendered":"http:\/\/www.gowe-group.com\/2024\/12\/30\/hello-world-7-3\/"},"modified":"2025-04-27T09:52:36","modified_gmt":"2025-04-27T01:52:36","slug":"kunshan-zhongyi-industrial-automation-co-ltd-high-end-manufacturing-and-retail-industrial-park","status":"publish","type":"post","link":"https:\/\/www.gowe-group.com\/fr\/kunshan-zhongyi-industrial-automation-co-ltd-high-end-manufacturing-and-retail-industrial-park\/","title":{"rendered":"Kunshan Zhongyi Industrial Automation Co., Ltd. Parc industriel de fabrication haut de gamme et de vente au d\u00e9tail"},"content":{"rendered":"<p>Le parc industriel Hunshan Zhongyi Industrial Automation Industrial Automation, situ\u00e9 dans la ville de Huaqiao, Kunshan City, Jiangsu, est un projet historique construit conjointement par Shengxin Construction Group Co., Ltd. et Gowe Group.<\/p>\n<p>Avec une superficie de 560 000 m\u00e8tres carr\u00e9s et une superficie de construction de 1,26 million de m\u00e8tres carr\u00e9s, le projet repr\u00e9sente un investissement total de 35 milliards de RMB.<\/p>\n<p>Une fois termin\u00e9, le parc industriel attirera les entreprises de fabrication haut de gamme d'Europe, des \u00c9tats-Unis, du Japon et des march\u00e9s int\u00e9rieurs, favorisant une cha\u00eene industrielle compl\u00e8te en amont et en aval.<\/p>\n<p>Shengxin Construction Group et Gowe Group ont jou\u00e9 un r\u00f4le central pour assurer le succ\u00e8s du projet, en tirant parti de leur expertise dans la construction \u00e0 grande \u00e9chelle et des solutions d'ing\u00e9nierie innovantes.<\/p>","protected":false},"excerpt":{"rendered":"<p>The Kunshan Zhongyi Industrial Automation High-End Manufacturing and Retail Industrial Park, located in Huaqiao Town, Kunshan City, Jiangsu, is a landmark project jointly constructed by Shengxin Construction Group Co., Ltd. and GOWE\u00a0Group. The project commenced in September 2022 and was completed in August 2023, spanning 11 months. With a site area of 560,000 square meters [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":3681,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[24,120,123,117,29,28,45,31,30,96],"tags":[],"class_list":["post-1562","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-project","category-industrial-building","category-all-prjoect-type","category-prjoect-type","category-product","category-area","category-east-asia","category-all-product","category-aluminium-formwork-system","category-ringlock-scaffolding"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.gowe-group.com\/fr\/wp-json\/wp\/v2\/posts\/1562","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.gowe-group.com\/fr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.gowe-group.com\/fr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.gowe-group.com\/fr\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.gowe-group.com\/fr\/wp-json\/wp\/v2\/comments?post=1562"}],"version-history":[{"count":0,"href":"https:\/\/www.gowe-group.com\/fr\/wp-json\/wp\/v2\/posts\/1562\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.gowe-group.com\/fr\/wp-json\/wp\/v2\/media\/3681"}],"wp:attachment":[{"href":"https:\/\/www.gowe-group.com\/fr\/wp-json\/wp\/v2\/media?parent=1562"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.gowe-group.com\/fr\/wp-json\/wp\/v2\/categories?post=1562"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.gowe-group.com\/fr\/wp-json\/wp\/v2\/tags?post=1562"}],"curies":[{"name":"WP","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}