gowe steel prop
Scaffolding Steel Tube-1
AluminIum Beams GOWE Group
British Drop Forged Board Retaining Coupler-1
Frame Scaffold-1
scaffolding plank-gowe
Single-sided Support Formwork System GOWE
GOWE High-Strength Stainless Steel Formwork System (2)
Aluminum Table Formwork GOWE
GOWE Timber Beams H20 (7)
Aluminium Formwork for sale,rental-GOWE
Wind Power & Hydropower Formwork
GOWE Precast Formwork
GOWE Waterproof MembraneInstallation Trolley
Segmental Assembly Formwork
GOWE-Hanging Basket Formwork
GOWE PIER FORMWORK
Single layer thin wall space lattice shell
Waterproof trolley
Segment bearing pedestal -2 (2)
High-rise frame structure
Gantry type steel frame workshop
Steel truss girder bridge
GOWE Electric Mast Climbing Work Platform
protection platform-gowe
Cantilever Formwork GOWE
Gowe project-Pier formwork- C1906

LTA C1906, Singapore

Located at 2A Tuas West Dr, Singapore, Contract 1906 (C1906) is a strategic infrastructure project commissioned by the Land Transport Authority (LTA). This project involves the design and construction of a critical railway viaduct that connects the Tuas West Extension (Tuas Link Station) to the Singapore Rail Test Centre (SRTC).

Project Details

Description

Located at 2A Tuas West Dr, Singapore, Contract 1906 (C1906) is a strategic infrastructure project commissioned by the Land Transport Authority (LTA). This project involves the design and construction of a critical railway viaduct that connects the Tuas West Extension (Tuas Link Station) to the Singapore Rail Test Centre (SRTC). As a dedicated link supporting 24/7 all-weather train testing services, the structural integrity of the viaduct is non-negotiable. GOWE is proud to have played a central role in this project by providing the specialized construction solutions for the Bridge Piers (Columns)—the fundamental pillars that support the weight and dynamic load of Singapore’s future rail testing network.

 

GOWE Project-C1906

 

GOWE Solution

For the C1906 viaduct, the construction of the bridge piers required a perfect balance of structural strength and architectural precision. GOWE provided a comprehensive Steel Formwork solution specifically engineered for the heavy-duty requirements of railway pier casting.

By utilizing GOWE’s high-performance Steel Pier Formwork systems, the project team achieved the rigorous vertical alignment and tight dimensional tolerances mandated by LTA standards. Our solution was designed to withstand the immense lateral pressure of large-volume concrete pours, ensuring that each bridge pier achieved a superior, smooth finish with maximum durability. To meet the project’s demanding schedule, our modular steel forms allowed for rapid assembly and efficient cycling between pier locations. Through our technical partnership on-site, we ensured that the backbone of the C1906 viaduct was built to last—reinforcing GOWE’s commitment to delivering world-class infrastructure solutions, anytime and anywhere.

Facebook
Twitter
LinkedIn

Related Solutions

Related Products

Related articles
Movable Scaffolding Systems: 2026 Bridge Project Guide
What Are Movable Scaffolding Systems and Why Are They...
How GOWE Aluminium Beams Optimize Shoring Systems
In modern civil engineering, aluminium beams have redefined...
How to Choose the Right Pipe Diameter for Stage Scaffolding Applications?
Why is Pipe Diameter Crucial for Stage Scaffolding? The...
How to Choose the Best Scaffolding Supplier in 2026
What Factors Should You Consider When Selecting a Scaffolding...
How Can Concrete Formwork Failures Be Prevented Effectively?
Common Causes of Concrete Formwork Failures Design...
A Comprehensive Technical Guide to GOWE Formwork Reinforcement Systems
Introduction In the rapidly evolving global construction...