{"id":6609,"date":"2026-04-08T15:31:18","date_gmt":"2026-04-08T07:31:18","guid":{"rendered":"https:\/\/www.gowe-group.com\/?p=6609"},"modified":"2026-04-08T15:35:19","modified_gmt":"2026-04-08T07:35:19","slug":"gowe-bridge-pier-construction-singapore-lta-c1906-viaduct","status":"publish","type":"post","link":"https:\/\/www.gowe-group.com\/ja\/gowe-bridge-pier-construction-singapore-lta-c1906-viaduct\/","title":{"rendered":"LTA C1906, Singapore"},"content":{"rendered":"<h3 data-path-to-node=\"4\">\u8aac\u660e<\/h3>\n<p data-path-to-node=\"5\">Located at <b data-path-to-node=\"4\" data-index-in-node=\"11\">2A Tuas West Dr, Singapore<\/b>, <b data-path-to-node=\"4\" data-index-in-node=\"39\">Contract 1906 (C1906)<\/b> is a strategic infrastructure project commissioned by the <b data-path-to-node=\"4\" data-index-in-node=\"119\">Land Transport Authority (LTA)<\/b>. This project involves the design and construction of a critical railway viaduct that connects the <b data-path-to-node=\"4\" data-index-in-node=\"249\">Tuas West Extension<\/b> (Tuas Link Station) to the <b data-path-to-node=\"4\" data-index-in-node=\"296\">Singapore Rail Test Centre (SRTC)<\/b>. As a dedicated link supporting 24\/7 all-weather train testing services, the structural integrity of the viaduct is non-negotiable. <b data-path-to-node=\"4\" data-index-in-node=\"462\">\u30b4\u30fc<\/b> is proud to have played a central role in this project by providing the specialized construction solutions for the <b data-path-to-node=\"4\" data-index-in-node=\"582\">Bridge Piers (Columns)<\/b>\u2014the fundamental pillars that support the weight and dynamic load of Singapore\u2019s future rail testing network.<\/p>\n<p>&nbsp;<\/p>\n<p><img fetchpriority=\"high\" decoding=\"async\" class=\"aligncenter size-full wp-image-6615\" src=\"https:\/\/www.gowe-group.com\/wp-content\/uploads\/2026\/04\/GOWE-Project-C1906.jpg\" alt=\"GOWE Project-C1906\" width=\"1980\" height=\"500\" srcset=\"https:\/\/www.gowe-group.com\/wp-content\/uploads\/2026\/04\/GOWE-Project-C1906.jpg 1980w, https:\/\/www.gowe-group.com\/wp-content\/uploads\/2026\/04\/GOWE-Project-C1906-300x76.jpg 300w, https:\/\/www.gowe-group.com\/wp-content\/uploads\/2026\/04\/GOWE-Project-C1906-1024x259.jpg 1024w, https:\/\/www.gowe-group.com\/wp-content\/uploads\/2026\/04\/GOWE-Project-C1906-768x194.jpg 768w, https:\/\/www.gowe-group.com\/wp-content\/uploads\/2026\/04\/GOWE-Project-C1906-1536x388.jpg 1536w, https:\/\/www.gowe-group.com\/wp-content\/uploads\/2026\/04\/GOWE-Project-C1906-18x5.jpg 18w, https:\/\/www.gowe-group.com\/wp-content\/uploads\/2026\/04\/GOWE-Project-C1906-600x152.jpg 600w\" sizes=\"(max-width: 1980px) 100vw, 1980px\" \/><\/p>\n<p>&nbsp;<\/p>\n<h3 data-path-to-node=\"6\">GOWE Solution<\/h3>\n<p data-path-to-node=\"6\">For the C1906 viaduct, the construction of the bridge piers required a perfect balance of structural strength and architectural precision. <b data-path-to-node=\"6\" data-index-in-node=\"139\">GOWE provided a comprehensive <a href=\"https:\/\/www.gowe-group.com\/ja\/product-category\/%e6%a9%8b%e3%83%88%e3%83%b3%e3%83%8d%e3%83%ab\/\">Steel Formwork solution<\/a><\/b> specifically engineered for the heavy-duty requirements of railway pier casting.<\/p>\n<p data-path-to-node=\"7\">By utilizing GOWE\u2019s high-performance <a href=\"https:\/\/www.gowe-group.com\/ja\/product\/%e6%a1%9f%e6%a9%8b%e5%9e%8b%e6%9e%a0\/\"><b data-path-to-node=\"7\" data-index-in-node=\"37\">Steel Pier Formwork systems<\/b><\/a>, the project team achieved the rigorous vertical alignment and tight dimensional tolerances mandated by LTA standards. Our solution was designed to withstand the immense lateral pressure of large-volume concrete pours, ensuring that each <b data-path-to-node=\"7\" data-index-in-node=\"298\">bridge pier<\/b> achieved a superior, smooth finish with maximum durability. To meet the project&#8217;s demanding schedule, our modular steel forms allowed for rapid assembly and efficient cycling between pier locations. Through our technical partnership on-site, we ensured that the backbone of the C1906 viaduct was built to last\u2014reinforcing GOWE\u2019s commitment to delivering world-class infrastructure solutions, anytime and anywhere.<\/p>","protected":false},"excerpt":{"rendered":"<p>Description Located at 2A Tuas West Dr, Singapore, Contract 1906 (C1906) is a strategic infrastructure project commissioned by the Land Transport Authority (LTA). This project involves the design and construction of a critical railway viaduct that connects the Tuas West Extension (Tuas Link Station) to the Singapore Rail Test Centre (SRTC). As a dedicated link supporting 24\/7 all-weather train testing services, the structural integrity of the viaduct is non-negotiable. GOWE is proud to have played a central role in this project by providing the specialized construction solutions for the Bridge Piers (Columns)\u2014the fundamental pillars that support the weight and dynamic load of Singapore\u2019s future rail testing network. &nbsp; &nbsp; GOWE [&hellip;]<\/p>\n","protected":false},"author":4,"featured_media":6620,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[24,119,117,29,28,37,41,124],"tags":[],"class_list":["post-6609","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-project","category-infrastructure","category-prjoect-type","category-product","category-area","category-south-asia","category-southeast-asia","category-steel-structure"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.gowe-group.com\/ja\/wp-json\/wp\/v2\/posts\/6609","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.gowe-group.com\/ja\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.gowe-group.com\/ja\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.gowe-group.com\/ja\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/www.gowe-group.com\/ja\/wp-json\/wp\/v2\/comments?post=6609"}],"version-history":[{"count":12,"href":"https:\/\/www.gowe-group.com\/ja\/wp-json\/wp\/v2\/posts\/6609\/revisions"}],"predecessor-version":[{"id":6623,"href":"https:\/\/www.gowe-group.com\/ja\/wp-json\/wp\/v2\/posts\/6609\/revisions\/6623"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.gowe-group.com\/ja\/wp-json\/wp\/v2\/media\/6620"}],"wp:attachment":[{"href":"https:\/\/www.gowe-group.com\/ja\/wp-json\/wp\/v2\/media?parent=6609"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.gowe-group.com\/ja\/wp-json\/wp\/v2\/categories?post=6609"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.gowe-group.com\/ja\/wp-json\/wp\/v2\/tags?post=6609"}],"curies":[{"name":"WP","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}