escora de aço gowe
Tubo de aço para andaimes-1
Vigas de alumínio Grupo GOWE
Acoplador de retenção de placa forjado em gota britânico-1
Estrutura do andaime-1
plano de andaimes-gowe
Sistema de cofragem de apoio unilateral GOWE
Sistema de cofragem em aço inoxidável de alta resistência GOWE (2)
Cofragem de mesa em alumínio GOWE
GOWE Timber Beams H20 (7)
Cofragem de alumínio para venda,aluguer-GOWE
Cofragem para energia eólica e hidroelétrica
Cofragem pré-fabricada GOWE
GOWE Membrana impermeávelTrolley de instalação
Cofragem para montagem de segmentos
Cofragem para cestos suspensos GOWE
COFRAGEM PARA CAIS GOWE
Casca de rede espacial de parede fina de camada única
Trolley impermeável
Pedestal de suporte de segmento -2 (2)
Estrutura de estrutura alta
Oficina com estrutura de aço do tipo pórtico
Ponte em viga treliçada de aço
GOWE Electric Mast Climbing Work Platform
plataforma de proteção-gowe
Cofragem cantilever GOWE
Gowe project-Pier formwork- C1906

LTA C1906, Singapore

Located at 2A Tuas West Dr, Singapore, Contract 1906 (C1906) is a strategic infrastructure project commissioned by the Land Transport Authority (LTA). This project involves the design and construction of a critical railway viaduct that connects the Tuas West Extension (Tuas Link Station) to the Singapore Rail Test Centre (SRTC).

Projeto Detalhes

Descrição

Located at 2A Tuas West Dr, Singapore, Contract 1906 (C1906) is a strategic infrastructure project commissioned by the Land Transport Authority (LTA). This project involves the design and construction of a critical railway viaduct that connects the Tuas West Extension (Tuas Link Station) to the Singapore Rail Test Centre (SRTC). As a dedicated link supporting 24/7 all-weather train testing services, the structural integrity of the viaduct is non-negotiable. Gowe is proud to have played a central role in this project by providing the specialized construction solutions for the Bridge Piers (Columns)—the fundamental pillars that support the weight and dynamic load of Singapore’s future rail testing network.

 

GOWE Project-C1906

 

GOWE Solution

For the C1906 viaduct, the construction of the bridge piers required a perfect balance of structural strength and architectural precision. GOWE provided a comprehensive Steel Formwork solution specifically engineered for the heavy-duty requirements of railway pier casting.

By utilizing GOWE’s high-performance Steel Pier Formwork systems, the project team achieved the rigorous vertical alignment and tight dimensional tolerances mandated by LTA standards. Our solution was designed to withstand the immense lateral pressure of large-volume concrete pours, ensuring that each bridge pier achieved a superior, smooth finish with maximum durability. To meet the project’s demanding schedule, our modular steel forms allowed for rapid assembly and efficient cycling between pier locations. Through our technical partnership on-site, we ensured that the backbone of the C1906 viaduct was built to last—reinforcing GOWE’s commitment to delivering world-class infrastructure solutions, anytime and anywhere.

Facebook
Twitter
LinkedIn

Relacionado Soluções

Relacionado Produtos

Relacionado Artigos
Understanding the Cost Implications of Different Formwork Materials
What Factors Drive the Cost of Different Formwork Materials? Key...
Movable Scaffolding Systems: 2026 Bridge Project Guide
What Are Movable Scaffolding Systems and Why Are They...
How GOWE Aluminium Beams Optimize Shoring Systems
In modern civil engineering, aluminium beams have redefined...
How to Choose the Right Pipe Diameter for Stage Scaffolding Applications?
Why is Pipe Diameter Crucial for Stage Scaffolding? The...
How to Choose the Best Scaffolding Supplier in 2026
What Factors Should You Consider When Selecting a Scaffolding...
Como é possível prevenir eficazmente fracassos de formas concretas?
Causas Comum de Fallos de Formas Concretas de Trabalho Design. ..