{"id":1562,"date":"2024-12-30T10:29:54","date_gmt":"2024-12-30T02:29:54","guid":{"rendered":"http:\/\/www.gowe-group.com\/2024\/12\/30\/hello-world-7-3\/"},"modified":"2025-04-27T09:52:36","modified_gmt":"2025-04-27T01:52:36","slug":"kunshan-zhongyi-industrial-automation-co-ltd-parque-industrial-de-fabrico-e-venda-a-retalho-de-alta-gama","status":"publish","type":"post","link":"https:\/\/www.gowe-group.com\/pt\/kunshan-zhongyi-industrial-automation-co-ltd-high-end-manufacturing-and-retail-industrial-park\/","title":{"rendered":"Kunshan Zhongyi Industrial Automation Co., Ltd. Parque industrial de fabrica\u00e7\u00e3o e varejo de ponta"},"content":{"rendered":"<p>O Kunshan Zhongyi Industrial Automation Manufacturing and Retail Industrial Park, localizado na cidade de Huaqiao, Kunshan City, Jiangsu, \u00e9 um projeto de refer\u00eancia constru\u00eddo em conjunto pelo Shengxin Construction Group Co., Ltd. e Gowe Group.<\/p>\n<p>Com uma \u00e1rea de 560.000 metros quadrados e uma \u00e1rea de constru\u00e7\u00e3o de 1,26 milh\u00e3o de metros quadrados, o projeto representa um investimento total de 35 bilh\u00f5es de RMB.<\/p>\n<p>Ap\u00f3s a conclus\u00e3o, o parque industrial atrair\u00e1 empresas de manufatura de ponta da Europa, Estados Unidos, Jap\u00e3o e mercados dom\u00e9sticos, promovendo uma cadeia industrial abrangente a montante e a jusante.<\/p>\n<p>O Shengxin Construction Group e o Gowe Group desempenharam pap\u00e9is fundamentais para garantir o sucesso do projeto, aproveitando sua experi\u00eancia em constru\u00e7\u00e3o em larga escala e solu\u00e7\u00f5es inovadoras de engenharia.<\/p>","protected":false},"excerpt":{"rendered":"<p>The Kunshan Zhongyi Industrial Automation High-End Manufacturing and Retail Industrial Park, located in Huaqiao Town, Kunshan City, Jiangsu, is a landmark project jointly constructed by Shengxin Construction Group Co., Ltd. and GOWE\u00a0Group. The project commenced in September 2022 and was completed in August 2023, spanning 11 months. With a site area of 560,000 square meters [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":3681,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[24,120,123,117,29,28,45,31,30,96],"tags":[],"class_list":["post-1562","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-project","category-industrial-building","category-all-prjoect-type","category-prjoect-type","category-product","category-area","category-east-asia","category-all-product","category-aluminium-formwork-system","category-ringlock-scaffolding"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.gowe-group.com\/pt\/wp-json\/wp\/v2\/posts\/1562","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.gowe-group.com\/pt\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.gowe-group.com\/pt\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.gowe-group.com\/pt\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.gowe-group.com\/pt\/wp-json\/wp\/v2\/comments?post=1562"}],"version-history":[{"count":0,"href":"https:\/\/www.gowe-group.com\/pt\/wp-json\/wp\/v2\/posts\/1562\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.gowe-group.com\/pt\/wp-json\/wp\/v2\/media\/3681"}],"wp:attachment":[{"href":"https:\/\/www.gowe-group.com\/pt\/wp-json\/wp\/v2\/media?parent=1562"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.gowe-group.com\/pt\/wp-json\/wp\/v2\/categories?post=1562"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.gowe-group.com\/pt\/wp-json\/wp\/v2\/tags?post=1562"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}