gowe steel prop
Scaffolding Steel Tube-1
AluminIum Beams GOWE Group
British Drop Forged Board Retaining Coupler-1
Frame Scaffold-1
scaffolding plank-gowe
Single-sided Support Formwork System GOWE
GOWE High-Strength Stainless Steel Formwork System (2)
Aluminum Table Formwork GOWE
GOWE Timber Beams H20 (7)
Aluminium Formwork for sale,rental-GOWE
Wind Power & Hydropower Formwork
GOWE Precast Formwork
GOWE Waterproof MembraneInstallation Trolley
Segmental Assembly Formwork
GOWE-Hanging Basket Formwork
GOWE PIER FORMWORK
Single layer thin wall space lattice shell
Waterproof trolley
Segment bearing pedestal -2 (2)
High-rise frame structure
Gantry type steel frame workshop
Steel truss girder bridge
GOWE Electric Mast Climbing Work Platform
protection platform-gowe
Cantilever Formwork GOWE
Changchun New District New Urbanization Construction Project

Changchun New District New Urbanization Construction

The Zhongke Street Extension and Xingfu Avenue Interchange, part of the Changchun New District New Urbanization Construction Project (Phase I), is a transformative infrastructure initiative jointly constructed by Heilongjiang Construction Engineering Group Co., Ltd. (Beihu Branch) and Gowe Group. Located in Beihu Science and Technology Development Zone, Changchun City, the project commenced in May 2020 and was completed in October 2020, showcasing remarkable efficiency and precision.

Project Details

The Zhongke Street Extension and Xingfu Avenue Interchange, part of the Changchun New District New Urbanization Construction Project (Phase I), is a transformative infrastructure initiative jointly constructed by Heilongjiang Construction Engineering Group Co., Ltd. (Beihu Branch) and Gowe Group. Located in Beihu Science and Technology Development Zone, Changchun City, the project commenced in May 2020 and was completed in October 2020, showcasing remarkable efficiency and precision.

The project features a “three roads and seven bridges” rapid road network system, including east-west Xingfu Avenue, north-south Beiyuanda Street, and Zhongke Street. With a total design length of 34.2 kilometers, the roads are built to urban expressway standards, with some sections meeting arterial road standards. The main road has 8 lanes in both directions, while the auxiliary has 6 lanes in both directions. The total construction volume reached 800,000 cubic meters.

As a critical transportation artery, the “three roads and seven bridges” system connects the Beihu Science and Technology Development Zone, the Airport Economic Demonstration Zone, and the China-South Korea Cooperation Demonstration Zone within Changchun New District. This infrastructure significantly enhances regional connectivity, promotes coordinated development among the district’s various zones, and creates new advantages for the rapid economic growth of Changchun New District.

Heilongjiang Construction Engineering Group and Gowe Group played pivotal roles in delivering this project. They leveraged their expertise in large-scale infrastructure construction to ensure timely and high-quality completion.

Facebook
Twitter
LinkedIn

Related Solutions

Related Products

Related articles
The Guide to Adjustable Steel Props in Modern Construction
In modern construction, temporary support structures...
Mobile Scaffold Solutions: How to Choose the Right One for Your Project
Why Mobile Scaffolds Are Essential for Modern Construction...
Aluminium Formwork Cost Factors Contractors Should Compare First
Why Aluminium Formwork Is Becoming Popular in Modern...
The Role of Formwork in Ensuring Concrete Structure Quality
Understanding Formwork and Its Importance in Construction In...
Ladders & Scaffolding: Essential Tools for Construction and Maintenance
Modern construction and maintenance work needs more...
Aluminium Formwork Buying Guide: How to Choose the Right System
Understanding Aluminium Formwork Systems What Is Aluminium...