gowe steel prop
Scaffolding Steel Tube-1
AluminIum Beams GOWE Group
British Drop Forged Board Retaining Coupler-1
Frame Scaffold-1
scaffolding plank-gowe
Single-sided Support Formwork System GOWE
GOWE High-Strength Stainless Steel Formwork System (2)
Aluminum Table Formwork GOWE
GOWE Timber Beams H20 (7)
Aluminium Formwork for sale,rental-GOWE
Wind Power & Hydropower Formwork
GOWE Precast Formwork
GOWE Waterproof MembraneInstallation Trolley
Segmental Assembly Formwork
GOWE-Hanging Basket Formwork
GOWE PIER FORMWORK
Single layer thin wall space lattice shell
Waterproof trolley
Segment bearing pedestal -2 (2)
High-rise frame structure
Gantry type steel frame workshop
Steel truss girder bridge
GOWE Electric Mast Climbing Work Platform
protection platform-gowe
Cantilever Formwork GOWE
Nuclear Power Plant Application Case-Gowe building machine

Lufeng Nuclear Power Plants

An intelligently controlled, large-scale modular platform from GOWE that integrates formwork, lifting, and safety systems into a single “vertical factory” for faster, safer construction.

Project Details

The Challenge: Engineering Precision for a New Generation of Nuclear Power

The construction of the Hualong One reactor at CGN Lufeng required a paradigm shift in methodology. The project demanded unprecedented levels of safety, precision, and schedule reliability to erect the reactor’s massive and complex containment structures.

Nuclear Power Plant Application Case-Gowe building machine

The GOWE Solution: An Integrated Self-Climbing Construction Platform

GOWE provided a 1,400-tonne integrated solution: the Building Machine. This system functions as an intelligently controlled, large-scale modular machinery platform that surrounds the entire reactor building, creating a controlled factory environment at height.

Key System Capabilities:

  • Full-Enclosure & Self-Climbing: The platform encircles the structure, climbing synchronously via a synchronized hydraulic jacking system. This provides a stable, protected workspace, independent of weather conditions.

  • Heavy-Load Capacity & Stability: The robust steel structure supports all concurrent construction activities, including heavy reinforcement and large-volume concrete pours, ensuring continuous workflow.

  • Typhoon-Resistant Design: Engineered to withstand extreme weather events, guaranteeing structural integrity and schedule adherence in a coastal environment.

Nuclear Power Plant Application Case-gowe construction platform

The Result: Setting a New Benchmark in Nuclear Construction

The Building Machine was pivotal in the construction of the Hualong One reactor containment. It enabled a faster, safer, and more precise construction process, directly contributing to the timely completion of a critical clean energy asset. A single Hualong One unit is designed to generate approximately 10 billion kWh of clean electricity annually, powering millions of homes and reducing CO₂ emissions by over 8 million tons per year.

Drive efficiency and safety on your next major project.

Explore the technical specifications and see how our integrated construction platform can deliver your project milestones with certainty.

Facebook
Twitter
LinkedIn

Related Solutions

Related Products

Related articles
GOWE’s Strategy for the "15th Five-Year Plan"
As the construction industry approaches the “15th...
Innovations in Formwork Frame Design: Trends for 2026
Why Is Formwork Frame Design Critical to Construction...
What Is the True Cost of Scaffolding?
The “true cost” of scaffolding extends...
What Is a Self-Climbing Platform? The Future of High-Rise Construction Efficiency
A self-climbing platform (SCP) is an intelligent, automated...
Slab Formwork Systems: Choosing the Right Solution for Your Project
What Is Slab Formwork and Why Is It Critical to Construction...
Aluminium Formwork Cost Comparison: Which Option Saves More in 2026
How Does Aluminium Formwork Compare to Traditional...