gowe steel prop
Scaffolding Steel Tube-1
AluminIum Beams GOWE Group
British Drop Forged Board Retaining Coupler-1
Frame Scaffold-1
scaffolding plank-gowe
Single-sided Support Formwork System GOWE
GOWE High-Strength Stainless Steel Formwork System (2)
Aluminum Table Formwork GOWE
GOWE Timber Beams H20 (7)
Aluminium Formwork for sale,rental-GOWE
Wind Power & Hydropower Formwork
GOWE Precast Formwork
GOWE Waterproof MembraneInstallation Trolley
Segmental Assembly Formwork
GOWE-Hanging Basket Formwork
GOWE PIER FORMWORK
Single layer thin wall space lattice shell
Waterproof trolley
Segment bearing pedestal -2 (2)
High-rise frame structure
Gantry type steel frame workshop
Steel truss girder bridge
GOWE Electric Mast Climbing Work Platform
protection platform-gowe
Cantilever Formwork GOWE

The fastest building speed that may blast your imagination: 452-meter height skyscraper completed in 33 months!

Please feel free to contact us for any of your needs!

Table of Contents

    The 106 Trade Tower: A Testament to Construction Innovation

    The 106 Trade Tower in Malaysia, a landmark built by China State Construction Engineering Corporation No. 8, stands as a testament to groundbreaking construction techniques. This 452-meter skyscraper, a prominent feature of Kuala Lumpur, was completed in an astonishing 33 months – a remarkable feat considering the typical construction timelines for such projects.

    What is the Sky-High Construction Machine?

    A key factor in this rapid construction was the utilization of a revolutionary “sky-high construction machine.” This innovative system integrates multiple construction processes into a single, moving platform. It encompasses formwork, concrete pouring, and curing operations within a self-contained, weather-protected environment, significantly enhancing efficiency and worker safety.

    Advantages of the Sky-High Construction Machine:

    • Unprecedented Speed:The machine’s vertical movement system allows for rapid floor-by-floor construction, with reports indicating the completion of a floor in as little as four days.
    • Enhanced Safety:The enclosed workspace provides a safe and controlled environment for workers, mitigating the risks associated with high-altitude construction.
    • Improved Precision:The machine incorporates advanced monitoring and control systems, ensuring precise and efficient operations.

    Challenges:

    While the sky-high construction machine offers significant advantages, it also presents challenges.

    • Complexity:The technology demands specialized expertise for operation and maintenance, increasing project costs and requiring a highly skilled workforce.
    • Limited Applicability:The machine’s current design may have limited applicability beyond super-tall buildings.
    • Ongoing Optimization:Further research and development are necessary to enhance the machine’s efficiency, reduce its weight, and expand its applicability to a wider range of construction projects.

    Conclusion:

    The sky-high construction machine represents a significant advancement in building technology. By revolutionizing the construction process for high-rise buildings, it has the potential to transform the industry. Continued innovation and refinement will further unlock the potential of this groundbreaking technology.