gowe steel prop
Scaffolding Steel Tube-1
AluminIum Beams GOWE Group
British Drop Forged Board Retaining Coupler-1
Frame Scaffold-1
scaffolding plank-gowe
Single-sided Support Formwork System GOWE
GOWE High-Strength Stainless Steel Formwork System (2)
Aluminum Table Formwork GOWE
GOWE Timber Beams H20 (7)
Aluminium Formwork for sale,rental-GOWE
Wind Power & Hydropower Formwork
GOWE Precast Formwork
GOWE Waterproof MembraneInstallation Trolley
Segmental Assembly Formwork
GOWE-Hanging Basket Formwork
GOWE PIER FORMWORK
Single layer thin wall space lattice shell
Waterproof trolley
Segment bearing pedestal -2 (2)
High-rise frame structure
Gantry type steel frame workshop
Steel truss girder bridge
GOWE Electric Mast Climbing Work Platform
protection platform-gowe
Cantilever Formwork GOWE
Goodman Huiyang Industrial Park Phase 3.1 and Phase 3.2 Project

Goodman Huiyang Industrial Park

The Goodman Huiyang Industrial Park Phase 3.1 and 3.2, located in Huiyang Economic Development Zone, Huizhou City, Guangdong Province, is a landmark project jointly constructed by Nantong No. 4 Construction Group Co., Ltd. and Gowe Group. The project commenced in May 2020 and was completed in August 2021, showcasing exceptional efficiency and quality.

Project Details

The Goodman Huiyang Industrial Park Phase 3.1 and 3.2, located in Huiyang Economic Development Zone, Huizhou City, Guangdong Province, is a landmark project jointly constructed by Nantong No. 4 Construction Group Co., Ltd. and Gowe Group. The project commenced in May 2020 and was completed in August 2021, showcasing exceptional efficiency and quality.

The industrial park’s total construction and installation cost was approximately 1.258 billion RMB. It spans 410,000 square meters and features a total construction area of 435,000 square meters. It comprises 14 warehouses and supporting facilities, including 8 single-story and 6 three-story warehouses. The total construction volume reached 590,000 cubic meters.

As the largest project of Australia’s Goodman Group in China and the largest industrial park in Huiyang District, Huizhou, the Goodman Huiyang Industrial Park significantly addresses the logistics, warehousing, and industrial real estate demands of Shenzhen and Dongguan, two core cities in the Greater Bay Area. Its strategic location and state-of-the-art facilities make it a key driver of regional economic growth and industrial development.

Nantong No. 4 Construction Group Co., Ltd. and Gowe Group played pivotal roles in delivering this project. They leveraged their expertise in large-scale industrial construction to ensure timely and high-quality completion.

Facebook
Twitter
LinkedIn

Related Solutions

Related Products

Related articles
Toeboard Scaffolding Safety: Preventing Falling Tools and Debris
Toeboard scaffolding helps stop tools, small materials...
Formwork Frame Maintenance: Best Practices to Extend Service Life
Formwork Frame Maintenance is a control system, not...
Supported Scaffold Planning: How to Improve Safety, Access and Site Efficiency
Supported Scaffold Planning should be completed before...
Aluminium Formwork Installation: How to Speed Up Floor Cycles
Aluminium formwork installation improves floor-cycle...
Shoring Scaffold Design: Supporting Slabs, Beams, and Formwork
A shoring scaffold should be designed as a temporary...
Access Tower Planning for Construction Projects: From Delivery to Site Approval
Access towers deliver better results when they are...